Skip to main content

Just In

Eavor Demobilizes Rigs in Geretsried: What It Means for Closed-Loop Geothermal Investors, Heat Markets, and Project Risk

Eavor Demobilizes Rigs from Geretsried: What It Really Means for Closed-Loop Geothermal For three years, two drilling rigs on a farm estate near Geretsried, a Bavarian town about 40 km south of Munich, stood as the symbol of the world's most ambitious closed-loop geothermal experiment. Now in October 2026,  Eavor Technologies, the Calgary-based developer of the Eavor-Loop, has told the town and its heating utility that both rigs would leave the site . The company said keeping idle rigs and specialist services on site was costly, and that releasing them would help put the project in the strongest position to continue with Loop 2 once its commercial structure is reworked . On the surface, this is a logistics decision. Underneath, it is one of the clearest signals yet about where first-of-a-kind geothermal technology stands, and how hard it is to turn a technical proof into a bankable business. This article explains exactly what happened, what the move means and what it does not mean...

Total Energies Nominates Alphaxioms For The Startupper of The Year Challenge,Lets Vote❤️🎉👏

Alphaxioms: Pioneering the Path to a Sustainable Future

By: Teflon Don



As the world grapples with the urgent need to combat climate change, innovative solutions and expert consultancy in renewable energy are paramount. Enter Alphaxioms, a dynamic player in the renewable energy sector, offering cutting-edge consultancy services across various domains including geothermal, solar, wind, energy evacuation, nuclear, hydrogen, and lithium.  Alphaxioms has been instrumental in driving sustainable energy projects, helping companies transition to greener practices and technologies.

Why Alphaxioms ?

With a proven track record, Alphaxioms has been at the forefront of renewable energy consultancy. Their expertise spans multiple renewable energy sources, ensuring that projects not only come to fruition but do so with maximum efficiency and sustainability. Here’s how they are making an impact:

Geothermal Energy : Unlocking the earth’s heat for clean power.

Solar Energy : Harnessing the sun’s power to generate electricity.

Wind Energy: Capturing the wind’s force to drive turbines.

Energy Evacuation: Ensuring efficient transmission and distribution of renewable energy.:

Nuclear Energy  Safe and sustainable nuclear solutions.

Hydrogen: Exploring hydrogen as a clean energy carrier.

Lithium: Advancing lithium technologies for better energy storage solutions.

In the fight against climate change, Alphaxioms' role is pivotal. Their innovative solutions and strategic partnerships are designed to accelerate the transition to renewable energy, aiming to cut down the time needed to mitigate climate change by half.

Support Alphaxioms in the Startupper of the Year Challenge

The "Startupper of the Year Challenge" by TotalEnergies is an unparalleled platform for entrepreneurs and startups to showcase their ideas and gain the support they need to bring their projects to life. This year, Alphaxioms is competing in the Business Creation Project category, representing a significant opportunity for them to expand their impact.

Here's how you can help Alphaxioms win and further their mission to combat climate change:


1. Visit the Platform: Go to the Startupper of the Year Challenge by TotalEnergies website.

2. Navigate to the Voting Section: Look for the Business Creation Project category.

3. Select East Africa : Choose East Africa from the list of regions.

4. Find Alphaxioms : Search for Alphaxioms among the listed projects.

5.Click “❤️”: Show your support by clicking the like button. Every vote counts!

 Why Your Vote Matters

By voting for Alphaxioms , you are not just supporting a project; you are endorsing a vision for a sustainable future. Alphaxioms’ commitment to renewable energy consultancy can significantly reduce the time needed to mitigate climate change, making your support crucial. 

Until July 24th, you have the opportunity to Make a Difference. Voting is simple and takes only a few seconds, but the impact of your support can be long-lasting.

 Spread the Word

Share the word about Alphaxioms’ participation in the Startupper of the Year Challenge. Encourage your friends, family, and networks to vote and support this vital cause. Together, we can help Alphaxioms lead the way in renewable energy and climate change mitigation.

The Startupper of the Year Challenge by Total Energies is more than a competition; it’s a movement towards innovation and sustainability. Alphaxioms is at the heart of this movement, driving change through their expertise in renewable energy. Your vote is a vote for a greener, more sustainable future. 

Join us in supporting . Visit the Total Energies [Startupper of the Year Challenge platform] vote for Alphaxioms , and be a part of the solution to climate change. The time to act is now! 

Source:Total Energies

Connect With Us:Alphaxioms

Comments

Popular posts from this blog

Ijen vs Zanskar: Blind Geothermal Energy Discovery and Development

Ijen’s Blind Geothermal System vs. Zanskar’s AI-Discovered Resources: Two Models for Finding Hidden Heat The geothermal industry is entering a new phase in which the most valuable resources may no longer be the fields marked by obvious hot springs, geysers, fumaroles, or steaming ground. Increasingly, developers are targeting “blind” or hidden geothermal systems,reservoirs that lack clear surface expressions but can still contain the temperature, permeability, and fluid needed for commercial power generation. Two examples illustrate how different parts of the industry are approaching this challenge. In Indonesia, the Blawan-Ijen geothermal field in East Java was developed through geological interpretation, magnetotelluric imaging, conceptual modelling, and drilling. The project is now operating commercially, with its first phase delivering approximately 35 MW to the Java grid under a 30-year power purchase agreement.  In the United States, Zanskar Geothermal & Minerals is using...

Vercana Electric Rig Advances Geothermal Brine Lithium Extraction Economics

Electric-Rig Direct Lithium Extraction From Geothermal Brine: The Economics of Vercana Versus Ormat Vulcan Energy Resources is pursuing an integrated model that combines geothermal drilling, direct lithium extraction, renewable electricity and industrial heat. Through its Vercana subsidiary, the company is also using electric drilling equipment designed to support the development of its Lionheart project in Germany’s Upper Rhine Valley. The approach differs from the conventional geothermal model represented by Ormat Technologies, whose core business remains geothermal power generation, equipment, project development and energy storage rather than commercial lithium recovery from geothermal brine.  The economic question is broader than whether an electric drilling rig costs less to operate than a diesel rig. The more important issue is whether electric drilling, geothermal energy and direct lithium extraction can create a more valuable integrated project than a conventional geotherm...

IID Secures Major, Local Geothermal Agreement to Strengthen Reliability

IID Secures 86 MW of Geothermal Power in Major Salton Sea Agreement The Imperial Irrigation District has signed 10-year agreements with BHE Renewables, through its CalEnergy subsidiary, to secure 86 megawatts of around-the-clock geothermal power from two established projects in California’s Imperial Valley. The agreement will strengthen IID’s electricity reliability, support renewable-energy compliance and help meet growing demand across the Imperial and Coachella valleys. The new contracts cover 44 MW from the Salton Sea 4 geothermal project and 42 MW from the Leathers geothermal project. Deliveries are scheduled to begin on January 1, 2027, giving IID access to dependable renewable electricity during a period of rising summer demand and increasing pressure on power systems across the American West. The agreement represents an important step in IID’s long-term resource planning. It combines existing geothermal generation with additional capacity from the Yuma Cogeneration facility in ...

California Court Orders New Environmental Review for Imperial County Geothermal Lithium Project

California Appeals Court Orders New Environmental Review for Imperial County Geothermal–Lithium Project Image: California Salton Lake Sea Hell’s Kitchen geothermal and lithium extraction plan sent back for deeper water, air-quality and mitigation analysis under CEQA A California appeals court has ordered Imperial County to conduct a more rigorous environmental review of the proposed Hell’s Kitchen geothermal power plant and lithium extraction project near the Salton Sea. The Fourth District Court of Appeal found that the county’s original environmental impact report (EIR) did not adequately address long-term water availability, enforceable mitigation measures for water shortages, or potential air-quality impacts tied to the receding Salton Sea. The ruling partially reverses a lower court decision and remands the case to Imperial County Superior Court, requiring the county and project developer Controlled Thermal Resources to address the identified deficiencies before the project can m...

Maryland Geothermal Rebate Program 2026: Residential Heating and Cooling Incentives Drive Strong Demand

Maryland’s Geothermal Rebate Program  FY26 Geothermal Rebate Program is entering its final stretch with funding already oversubscribed, which is a strong sign that homeowner interest in geothermal heating and cooling is rising quickly in the state.  The program offers a $3,000 rebate for eligible new geothermal heating and cooling systems for Maryland residents in single-family detached homes and townhomes, but the application portal is now closed while the state works through the existing queue. That update matters because it shows how incentive programs can move from a policy idea into real household demand very quickly. A program with a $150,000 budget does not usually run out of room unless homeowners, contractors, and installers all see geothermal as a practical investment. In Maryland’s case, the fact that requests exceeded the full FY26 budget suggests the market is responding to both energy-cost concerns and long-term efficiency goals. What the program offers The Maryl...

Geothermal Projects In Africa, Countries Overview

 Geothermal Projects in Africa: Country-wise Overview By : Robert Buluma Africa is increasingly turning to geothermal energy as a sustainable solution to meet its growing electricity demands. With abundant geothermal resources spread across the continent, several countries have embarked on ambitious projects to harness this clean and renewable energy source. Let's delve into the geothermal projects in various African countries, highlighting key players and prospects. Algeria Algeria is exploring its geothermal potential, particularly in the northern regions. Although in the early stages, initiatives are underway to assess feasibility and potential locations for geothermal power plants.  Burundi Burundi has shown interest in developing its geothermal resources, primarily in the northwest region near Lake Tanganyika. The government is actively seeking partnerships with international firms to kickstart exploration and development efforts. Comoros The Comoros Islands are situated ...

Endurance Energy Tests World's First Subsea Geothermal Well at Axial Seamount

Endurance Energy Tests the World's First Subsea Geothermal Well: What the Axial Seamount Demonstration Really Proved What if geothermal energy did not need a power plant on land? What if electricity could be produced directly from the Earth's heat beneath the ocean, with generators sitting on the seafloor and sending power to coastal grids? On October 19, 2026, Seattle-based startup Endurance Energy announced a major step toward that idea. The company said it had drilled and completed the world's first subsea geothermal well and placed a 3-ton test power plant nearly a mile beneath the Pacific. It also reported net-positive electricity from heat at an active underwater volcano, according to its announcement on PR Newswire. The headline numbers are modest. The Adélie prototype produced more electricity than it used for about 8.7 seconds. During that time it delivered a median net output of about 2 kilowatts and a peak of 16.5 kilowatts. One detail matters more than any other...

Eavor Demobilizes Rigs in Geretsried: What It Means for Closed-Loop Geothermal Investors, Heat Markets, and Project Risk

Eavor Demobilizes Rigs from Geretsried: What It Really Means for Closed-Loop Geothermal For three years, two drilling rigs on a farm estate near Geretsried, a Bavarian town about 40 km south of Munich, stood as the symbol of the world's most ambitious closed-loop geothermal experiment. Now in October 2026,  Eavor Technologies, the Calgary-based developer of the Eavor-Loop, has told the town and its heating utility that both rigs would leave the site . The company said keeping idle rigs and specialist services on site was costly, and that releasing them would help put the project in the strongest position to continue with Loop 2 once its commercial structure is reworked . On the surface, this is a logistics decision. Underneath, it is one of the clearest signals yet about where first-of-a-kind geothermal technology stands, and how hard it is to turn a technical proof into a bankable business. This article explains exactly what happened, what the move means and what it does not mean...

"US Geothermal Tax Credits 2026: What the IRA/45Q Changes Mean for Developers"

US Geothermal Tax Credits in 2026: What Is Actually Still Alive After OBBBA For an industry that spent more than a decade building financial models around a stable federal incentive structure, 2026 has been a year of whiplash. The 30% federal geothermal tax credit that developers and homeowners built forecasts around is gone in one form and still alive in another, and even the IRS’s own public guidance has been confusing enough to trigger uncertainty across the market. That confusion is not a minor clerical issue. It is shaping investment decisions, contractor sales pitches, homeowner timelines, and project finance assumptions right now. If you work in geothermal, the key question is no longer whether federal incentives exist, but which incentive applies, to which project type, and under what ownership structure. The law that changed the timeline To understand where things stand in 2026, you have to start with the Inflation Reduction Act of 2022, which created a long runway for clean e...

KenGen Risks Losing Olkaria Geothermal Wells Over Licence Error

KenGen Risks Losing Olkaria Wells Over 18-Year Licence Blunder Kenya Electricity Generating Company (KenGen) faces a serious legal and operational risk at Olkaria after an error in the coordinates of its geothermal licence left part of the company’s wells, steam infrastructure and other assets outside its legally recognised area. The licensing mistake, made nearly two decades ago, remains unresolved despite the Ministry of Energy and Petroleum acknowledging the problem in 2017.  The dispute has raised questions about the security of KenGen’s investments, the government’s management of geothermal resources and the potential consequences for Kenya’s electricity supply. Olkaria is the country’s most important geothermal centre and accounts for the overwhelming majority of Kenya’s installed geothermal generation capacity.  Licence Error Exposes Strategic Assets The problem dates back to September 19, 2008, when the Ministry of Energy and Petroleum issued KenGen a licence covering ...