KenGen Risks Losing Olkaria Wells Over 18-Year Licence Blunder Kenya Electricity Generating Company (KenGen) faces a serious legal and operational risk at Olkaria after an error in the coordinates of its geothermal licence left part of the company’s wells, steam infrastructure and other assets outside its legally recognised area. The licensing mistake, made nearly two decades ago, remains unresolved despite the Ministry of Energy and Petroleum acknowledging the problem in 2017.  The dispute has raised questions about the security of KenGen’s investments, the government’s management of geothermal resources and the potential consequences for Kenya’s electricity supply. Olkaria is the country’s most important geothermal centre and accounts for the overwhelming majority of Kenya’s installed geothermal generation capacity.  Licence Error Exposes Strategic Assets The problem dates back to September 19, 2008, when the Ministry of Energy and Petroleum issued KenGen a licence covering ...

Derisking a Geothermal Project

Derisking Strategies for a Successful Geothermal Business
Image source: Robert Buluma,Camera


Introduction:

The renewable energy sector has experienced significant growth in recent years, with geothermal energy emerging as a viable and sustainable option. Geothermal power plants utilize the Earth's natural heat to generate electricity, making it an attractive and eco-friendly alternative to traditional fossil fuel-based energy sources. However, like any business venture, geothermal projects come with their own set of risks. To ensure long-term success, it is crucial to implement strategies that effectively derisk a geothermal business. In this article, we will explore several key approaches to mitigate risks and maximize the potential of a geothermal project.

1. Comprehensive Geothermal Resource Assessment:

Thoroughly assessing the geothermal resource is a critical first step in derisking a geothermal business. Conducting extensive geological surveys, exploratory drilling, and data analysis will provide valuable insights into the resource's potential. Understanding factors such as reservoir size, temperature, permeability, and recharge rates will help in estimating the long-term productivity and financial viability of the project. Investing in reliable data collection and analysis during the early stages can significantly reduce uncertainties and minimize potential risks.

2. Establishing Strong Partnerships:

Forming strategic partnerships with experienced industry players can be immensely beneficial in derisking a geothermal business. Collaborating with geothermal experts, engineering firms, equipment suppliers, and financial institutions can provide access to specialized knowledge, technical expertise, and financial resources. Partnerships can also facilitate risk-sharing and help navigate complex regulatory frameworks and permitting processes. Additionally, having strong relationships with local communities, government agencies, and stakeholders will foster support and facilitate smoother project development.

3. Robust Project Planning and Feasibility Studies:

Comprehensive project planning and feasibility studies are indispensable for derisking a geothermal business. These studies assess the technical, financial, and environmental aspects of the project, identifying potential challenges and risks. They help in determining the optimal plant capacity, design, and technology choices. Conducting a detailed cost-benefit analysis, including revenue projections and financial modeling, will provide a clear understanding of the project's profitability and return on investment. Moreover, addressing potential environmental impacts early on and designing suitable mitigation measures will help avoid regulatory hurdles and potential conflicts.

4. Accessing Financing Options:

Securing adequate financing is crucial for the successful implementation of geothermal projects. Geothermal investments typically require substantial upfront capital due to the costs associated with drilling, infrastructure development, and plant construction. Derisking a geothermal business involves exploring diverse financing options, such as project financing, public-private partnerships, venture capital, and grants. Engaging with financial institutions and investors experienced in the renewable energy sector can provide access to funding and reduce financial risks. Governments and international organizations often offer incentives and grants for renewable energy projects, which can further aid in reducing financial burdens.

5. Long-Term Operation and Maintenance Planning:

Planning for the long-term operation and maintenance of a geothermal power plant is essential to ensure its sustained performance. Regular maintenance, monitoring, and early detection of potential issues can prevent costly downtime and extend the plant's lifespan. Establishing robust maintenance protocols, training qualified personnel, and implementing remote monitoring systems can enhance the operational efficiency and reliability of the facility. Proactive asset management and timely repairs or replacements of equipment will minimize operational risks and optimize energy generation.

Conclusion:

Derisking a geothermal business requires a proactive and comprehensive approach to mitigate uncertainties and maximize the chances of success. Thorough resource assessment, strategic partnerships, robust project planning, accessing suitable financing, and implementing effective operation and maintenance strategies are key elements in reducing risks associated with geothermal projects. By incorporating these strategies, developers and investors can navigate the challenges of the geothermal industry, enhance project viability, and contribute to the growth of sustainable and clean energy source

Source : alphaxioms.blogspotcom

Comments

Popular posts from this blog

Jicarilla Apache Geothermal Study Wins $2.5 Million Grant

Jicarilla Apache Nation Launches $2.5 Million Geothermal Feasibility Study The Jicarilla Apache Nation in northern New Mexico has launched a major investigation into its geothermal energy potential after receiving a $2.5 million grant from the State of New Mexico. The funding will support a detailed feasibility study examining whether underground heat resources on tribal lands could be developed for electricity generation, direct heating, or other energy applications. The initiative represents an important step in the Nation’s efforts to understand and diversify its energy resources. Although the Jicarilla Apache Nation has not yet committed to building a geothermal facility, the study could provide the geological, technical, and economic information required for future investment decisions. The project is particularly significant because the Nation already has extensive experience with subsurface exploration through its oil and gas activities. Existing geological records, drilling inf...

Vercana Electric Rig Advances Geothermal Brine Lithium Extraction Economics

Electric-Rig Direct Lithium Extraction From Geothermal Brine: The Economics of Vercana Versus Ormat Vulcan Energy Resources is pursuing an integrated model that combines geothermal drilling, direct lithium extraction, renewable electricity and industrial heat. Through its Vercana subsidiary, the company is also using electric drilling equipment designed to support the development of its Lionheart project in Germany’s Upper Rhine Valley. The approach differs from the conventional geothermal model represented by Ormat Technologies, whose core business remains geothermal power generation, equipment, project development and energy storage rather than commercial lithium recovery from geothermal brine.  The economic question is broader than whether an electric drilling rig costs less to operate than a diesel rig. The more important issue is whether electric drilling, geothermal energy and direct lithium extraction can create a more valuable integrated project than a conventional geotherm...

Billionaire Families Bet on Advanced Geothermal Energy Investments

Billionaire Geothermal Families Bet on Geothermal Billionaire families and private investment offices are placing increasingly large bets on geothermal energy, especially on technologies designed to make the resource available in more locations. Their investments are helping finance enhanced geothermal systems, advanced drilling, closed-loop designs, and other approaches that could transform geothermal from a regionally concentrated power source into a globally scalable clean-energy industry. The investment surge reflects a broader change in the energy market. Electricity demand is rising because of artificial intelligence, data centers, industrial electrification, electric vehicles, and the expansion of digital infrastructure. At the same time, utilities and large corporations need power that is reliable around the clock. Solar and wind remain essential to the clean-energy transition, but their output varies with weather and time of day. Geothermal could complement these technologies ...

Next-Gen Geothermal Funding 2026: VCs, Banks, Government Capital

Who Is Really Funding Next-Gen Geothermal in 2026? Next-generation geothermal has moved beyond laboratory research into a capital-intensive commercialization phase. In 2026, the most important financing is no longer coming from one investor category: venture capital funds are financing drilling, subsurface modelling and hardware; strategic energy companies are providing equipment, project access and market credibility; banks are beginning to lend against contracted projects; and governments are absorbing exploration and first-of-a-kind technology risk. The strongest financing activity is concentrated in the United States and Canada, but Europe is becoming increasingly important through Germany-based deployment, European Union grants, UK innovation support, and strategic participation from European energy companies. The central investment question is changing from “Can this technology work?” to “Can the developer deliver repeatable, financeable projects at commercial cost?” The 2026 fun...

Global Geothermal Investment 2026: 15 High-Growth Markets

Global Geothermal Investment 2026: 15 Markets Where Developers Should Look Next Geothermal energy is entering its most investable decade yet, with developers, drilling contractors, turbine suppliers and private capital providers scanning a widening map of opportunities beyond the traditional “big five” producers.  This article profiles 15 markets where project pipelines, policy signals, resource quality and technology readiness converge to create compelling entry points in 2026 and beyond.  Why 2026 Is a Turning Point for Geothermal Capital Global geothermal investment is accelerating as governments seek firm, low‑carbon baseload to back up variable wind and solar, while advanced drilling and subsurface engineering lower costs and expand the resource base. Market analysts project the geothermal energy market to reach roughly USD 13.56 billion by 2030, up from about USD 9.81 billion in 2025, implying sustained double‑digit growth in development spend. Capital is flowing not onl...

Western Geothermal Power Transmission Roadmap Toward 2030

Geothermal Power in the Western United States: A Transmission and Planning Roadmap to 2030 Introduction The Western United States is approaching a decisive period for geothermal power. Electricity demand is rising because of data centers, industrial electrification, population growth, electric vehicles and the replacement of retiring fossil-fuel generation. At the same time, utilities are under growing pressure to add clean resources that can operate reliably when solar and wind output declines. Geothermal power is well positioned to fill this role. Unlike weather-dependent generation, geothermal plants can provide firm electricity for long periods, support grid reliability and reduce the amount of storage required in deeply decarbonized power systems. However, the industry’s expansion will depend on more than subsurface heat and drilling technology. By 2030, transmission access, resource planning, project finance, permitting and utility procurement will determine whether geothermal be...

Ijen vs Zanskar: Blind Geothermal Energy Discovery and Development

Ijen’s Blind Geothermal System vs. Zanskar’s AI-Discovered Resources: Two Models for Finding Hidden Heat The geothermal industry is entering a new phase in which the most valuable resources may no longer be the fields marked by obvious hot springs, geysers, fumaroles, or steaming ground. Increasingly, developers are targeting “blind” or hidden geothermal systems,reservoirs that lack clear surface expressions but can still contain the temperature, permeability, and fluid needed for commercial power generation. Two examples illustrate how different parts of the industry are approaching this challenge. In Indonesia, the Blawan-Ijen geothermal field in East Java was developed through geological interpretation, magnetotelluric imaging, conceptual modelling, and drilling. The project is now operating commercially, with its first phase delivering approximately 35 MW to the Java grid under a 30-year power purchase agreement.  In the United States, Zanskar Geothermal & Minerals is using...

Alberta Geothermal Startup Phase Secures Funding for High-Temperature Drilling Sensors

Alberta’s Phase Targets a Critical Geothermal Drilling Barrier With High-Temperature Sensors Alberta is using its deep oil-and-gas expertise to pursue a new opportunity beneath the surface: geothermal energy. Among the companies receiving support through Emissions Reduction Alberta’s Drilling Technology Challenge is Edmonton-based Phase Advanced Sensor Systems Corp., which is developing a high-temperature downhole pressure sensor for enhanced geothermal systems. The project addresses a problem that could determine whether deep geothermal energy becomes commercially viable: operators need reliable, accurate information from wells exposed to extreme heat and pressure. Phase plans to demonstrate a sensor capable of operating at temperatures above 200°C, with testing planned at 200°C, 250°C and 275°C.  The project has a total value of approximately C$1.57 million, including C$420,000 in ERA funding, according to Alberta’s project information.  Dealroom reported the award as approx...

Unlocking Impermeable Geothermal Reservoirs: Hydraulic Stimulation, Menengai and Olkaria

Unlocking the Impermeable Reservoir: Lessons from a 30-Year Reservoir Engineer An Alphaxioms interview with Richard Joseph Holt, Principal Consultant in Reservoir Engineering at RESPEC . Context: Menengai East and Olkaria Central. Every geothermal developer knows the moment.  The rig is gone and the money is spent. The well is drilled to depth, the temperature is there, and then the well will not flow. The heat is real, but the connection between the well and the reservoir is not. Wells like this sit at the centre of one of the most important questions in geothermal development: what do you do with a tight reservoir? Walk away and drill again, or find a way to unlock what is already there? To explore the question, Alphaxioms spoke with Richard Joseph Holt, Principal Consultant in Reservoir Engineering at RESPEC . Richard brings 30 years of global experience in geothermal energy.  We framed our questions around two settings, Menengai East and Olkaria Central, and asked him how ...

Kaishan Targets 2 GW Kenya Geothermal Development Across Five Fields

Kaishan Targets 2 GW of Geothermal Development Across Kenya Kenya's geothermal sector has opened a potentially significant new chapter after Kaishan Group and the Geothermal Development Company (GDC) signed a collaboration framework agreement covering five geothermal blocks in the East African Rift Valley. Signed in Nairobi on September 14, 2026 , the agreement establishes a framework for the two parties to explore potential joint development of Silali, Paka, Korosi, Baringo and Suswa . According to Kaishan, the five areas have potential to support approximately 2 GW of installed geothermal capacity . The headline figure is substantial, but it is important to distinguish between resource potential and committed generation capacity . The framework agreement is non-binding. The parties will first conduct due diligence, assess the resources and negotiate development plans before potentially signing separate binding agreements for individual geothermal blocks. The development coul...