Skip to main content

Posts

Showing posts with the label Power Plant

Just In

Innargi Geothermal drives Europe's renewable district heating decarbonisation from Aarhus to Poland

Innargi Geothermal, Decarbonising Europe's Heat, One City at a Time In an era defined by the urgent need to decarbonise Europe’s energy systems, one critical sector often remains overlooked, heating. Accounting for a substantial portion of the continent’s energy consumption, the heating sector has long been dominated by fossil fuels and biomass. Enter Innargi Geothermal, a Danish company on a mission to change that, one community at a time. Founded in 2017 by A.P. Møller Holding, Innargi has rapidly evolved from a single-project venture in Aarhus into an international geothermal energy company with a growing portfolio across Northern and Eastern Europe. By applying decades of subsurface expertise from the oil and gas industry to the untapped potential of geothermal energy, Innargi is industrialising geothermal district heating at a scale never before seen in the European Union. This article takes a deep dive into Innargi’s operations, exploring its revolutionary business model and ...

Iran’s First Geothermal Power Plant Connects to the National Grid, Marking a New Era in Clean Energy

Iran’s First Geothermal Power Plant Connected to the Grid: What Meshgin-Shahr Means for the Country’s Energy Future Image: A thematic image of a geothermal power plant  Iran has taken a notable step in clean power with the Meshgin-Shahr geothermal plant in Ardabil province, which has now been connected to the national electricity grid and begun generating electricity. The first phase is 5 MW, supported by a reported investment of 10 million euros, while the broader geothermal reservoir is described as having a potential production capacity of about 250 MW.  A Landmark for Iranian Geothermal The significance of this project goes beyond the first megawatts delivered to the grid. It marks Iran’s formal entry into commercial geothermal power generation at a time when many countries are looking for firm, low-carbon electricity that does not depend on weather conditions. According to the report, the plant is being developed by the Thermal Power Generation Holding Company and is loca...

Exergy, Baseload Sighn LOI For Kopsvatn Geothermal Plant In Iceland

Revolutionizing Geothermal Energy: Exergy Partners with Baseload Power Iceland to Transform Kopsvatn  By: Robert Buluma Image: Baseload Iceland,C.E.O Marta Ros Karlsdottir and Exergy's Luca Pozzoni shake hands upon signing of the LOI , Image source Exergy on LinkedIn In a groundbreaking development for geothermal energy, Exergy has signed a Letter of Intent (LOI) with Baseload Power Iceland to supply two Organic Rankine Cycle (ORC) units for the Kopsvatn geothermal power plant in Flúðir, Iceland. This partnership signifies a monumental leap in the utilization of small-scale binary systems that combine heat and power, paving the way for a global revolution in sustainable energy production.    A Milestone in Small-Scale Geothermal Innovation   The Kopsvatn geothermal power plant project embodies innovation at its finest. By integrating Exergy’s state-of-the-art ORC technology with Baseload Power Iceland’s strategic vision, this collaboration underscores the i...

Warmeverband To Start Geothermal Power Plant Construction Upon a Succeful Geological Survey Come 2025

Harnessing Earth's Energy: Riehen's Groundbreaking Geothermal Endeavor By: Robert Buluma In the heart of Riehen, Switzerland, a quiet revolution is underway, one that promises to reshape the community's energy landscape for decades to come. For the past 30 years, Riehen has been tapping into the Earth's natural warmth to power its heating systems, pioneering the use of geothermal energy in the region. Now, with a newfound zeal for sustainable energy solutions, the town is embarking on an ambitious journey towards expanding its geothermal infrastructure. The latest chapter in Riehen's geothermal saga unfolds with the revelation of a prospective site for a second geothermal facility. The announcement, made by the Riehen District Heating Company (Wärmeverbund Riehen AG), marks a significant milestone in the town's quest for energy independence. After meticulous assessments and geological surveys, a parcel of land in the Grendelmatten area emerged as the prime locat...

Construction Started of Wai-2 Geothermal Power Plant In Kumamoto Japan

Unveiling the Future: Construction Begins on Wai-2 Geothermal Power Plant By: Robert Buluma In a groundbreaking move towards sustainable energy, Furusato Thermoelectric Co., Ltd. has embarked on an ambitious project to build the Wai-2 Geothermal Power Plant. Led by the visionary leadership of CEO Kazuyuki Akaiishi, the company announced this momentous endeavor on March 22, 2024, marking a significant step forward in the realm of renewable energy. Located in the picturesque town of Oguni, nestled in the heart of Kumamoto Prefecture's Aso District, the Wai-2 Geothermal Power Plant is set to revolutionize the region's energy landscape. With a planned commercial operation slated for March 2026, this state-of-the-art facility aims to harness the Earth's natural heat to generate clean, sustainable electricity. What sets the Wai-2 Geothermal Power Plant apart is not just its cutting-edge technology but also its commitment to community collaboration. Building upon the success of th...

Mercury Collaborates With Ormat To Expand Nga Tamariki Geothermal Station With Additional 45 MW

Unveiling a New Era: Ngā Tamariki Geothermal Station Expansion Underway! By: Robert Buluma In a symbolic gesture marked by the clinking of shovels against the earth, a new chapter in renewable energy dawned as the groundbreaking ceremony for the fifth generating unit at the Ngā Tamariki geothermal commenced. The air was filled with anticipation and reverence as representatives from Tauhara North 2 Trust , Tahu Ngati Whaoa , and their esteemed delivery partner, Ormat gathered to bless and celebrate this momentous occasion. At the heart of this expansion lies a profound commitment to sustainability and cultural preservation. Collaborating closely with their valued partners,  Tauhara North 2 Trust and the wider mana whenua Ngāti Tahu Ngati Whaoa ,They had meticulously crafted a plan that not only ensures the long-term health of the land but also honors its sacred significance as a taonga. The addition of this new unit marks a pivotal milestone in  Mercury ongoing mission to cha...

PT PLN(Persero) Kamojang's Power Plant leads the way in Green Hydrogen Production

Harnessing Geothermal Energy: Kamojang Power Plant Leads the Way in Green Hydrogen Production By : Robert Buluma In a significant leap towards sustainable energy, the Kamojang geothermal power plant in West Java, Indonesia, has embarked on a pioneering journey by commencing the production of geothermal-based green hydrogen. Operated by the state-owned electricity company PT PLN, this initiative marks a pivotal moment in the realm of renewable energy production, not just for Indonesia but for the entire Southeast Asian region. Green hydrogen, a clean fuel source, is derived from the condensation water generated during the geothermal power production process at Kamojang. This innovative approach underscores the plant's commitment to environmental stewardship while tapping into the abundant renewable energy resources available in the region. With the commencement of operations at Kamojang, PT PLN's green hydrogen output is set to increase by up to 4.3 tons annually. This boost in ...

Globeleq 35 MW Menengai Geothermal Plant Project To Start by April 2025

 Bringing Sustainable Energy to Kenya: Globeleq's 35 MW Geothermal Power Project in Menengai In a significant stride towards sustainable energy development in Kenya, Globeleq, a leading independent power producer, is set to embark on a groundbreaking 35 MW geothermal power project in Menengai. With the project slated to commence construction next week, the collaboration between Globeleq and its partners marks a pivotal moment in Kenya's renewable energy journey. Mobilization of Construction Teams and Commencement of Civil Works Globeleq has joined forces with prominent EPC contractors, Toyota Tsusho Corporation and CFAO Kenya Limited, to kickstart the mobilization of construction teams. The commencement of civil works signals the beginning of a transformative phase for the Menengai region and the broader Kenyan energy landscape. Timeline and Project Scope The construction phase is estimated to span 23 months, with full operation expected to commence around the quarter of 2025. ...

Popular posts from this blog

Eavor Kleefeld II Permit Boosts Hannover Geothermal Expansion and Deep Heat Development

Eavor Secures Kleefeld II: A New Milestone for Hannover’s Deep Geothermal Ambitions Image: A Thematic image of The Eavor Project at Geretsried  Eavor’s new Kleefeld II permit marks an important step forward for deep geothermal development in Hannover, reinforcing the city’s position as one of Germany’s most closely watched urban heat-transition markets . The licence covers about 64.5 square kilometers, lasts for three years, and combines the former Buchholz and Kleefeld I exploration areas into a single, larger field that Eavor already controlled. The decision is more than an administrative update. It signals continued confidence in geothermal as a practical, scalable source of district heating in a dense metropolitan region. For Hannover, it also strengthens a project that has been building momentum for several years and could become a reference case for other European cities seeking cleaner, locally produced heat. A New Chapter For Hannover Kleefeld II sits in the northeast of...

TAQA Geothermal and Strataphy Collaborates To Advance Saudi Arabia Geothermal Cooling

PrimeLoop and the Geothermal Cooling Revolution in Saudi Arabia Image: Pictorial Views Saudi Arabia is entering a new phase in cooling technology, and geothermal cooling is becoming one of the most compelling solutions in that transition. At the center of this shift is PrimeLoop, Strataphy’s proprietary geothermal cooling system, which is being positioned as a commercial answer to one of the region’s most urgent infrastructure challenges: how to cool buildings efficiently in extreme heat while reducing electricity demand and water use. This matters because cooling is not a minor utility in the Gulf. It is a core operating cost, a grid stability issue, and an environmental pressure point all at once. In a country where ambient temperatures can push conventional air-conditioning systems to their limits, the search for smarter cooling is no longer theoretical. It is now a commercial necessity. PrimeLoop is interesting because it does not simply improve on conventional cooling. It rethinks...

University of Aberdeen and RGU partner to accelerate geothermal heating deployment

University of Aberdeen and RGU join forces to accelerate geothermal energy research and heat-network deployment Image: Lucy Leiper, Director of Research, Innovation & Enterprise at the University of Aberdeen and Christina Laing, Business Development Manager at Robert Gordon University The University of Aberdeen and Robert Gordon University (RGU) have signed a Memorandum of Agreement to explore collaborative research, training and commercial activity in geothermal energy and low-carbon heating. This strategic partnership aims to combine subsurface expertise, drilling and modelling capabilities, supply-chain development, and skills training to accelerate geothermal deployment and support the just transition to net-zero heating across Scotland and beyond. Why this partnership matters for the geothermal sector Geothermal heat offers a predictable, baseload source of low-carbon thermal energy that can decarbonise district heating, industry process heat and building heating demand. Scotl...

XGS Energy IPO: Morgan Stanley, Geothermal Growth, and Fervo’s Market Momentum

XGS Energy Weighs IPO After Hiring Morgan Stanley, Chasing Fervo's Geothermal Momentum Geothermal developer XGS Energy has hired Morgan Stanley to evaluate an initial public offering, positioning itself as a potential second geothermal IPO of 2026 after Fervo Energy's blockbuster listing. The move underscores growing investor appetite for clean, firm power technologies as data-center demand and grid reliability concerns reshape the energy investment landscape. The Scoop: Morgan Stanley, IPO Timing, and Market Context In early July 2026, Axios Pro reported that XGS Energy engaged Morgan Stanley to assess a public listing, with company leadership potentially deciding within about a month whether to proceed. The timing is strategic: Fervo Energy's May 2026 IPO created a rare "open window" for geothermal equities, providing valuation benchmarks and investor education that earlier private rounds lacked. For investors, the narrative is straightforward. If Fervo proved t...

Geothermal Steam Output Gap, Decline, Integrity, and Life Extension

The Disparity Between Anticipated and Actual Geothermal Steam Output Image: thematic image of the Hellisheiði geothermal power plant in Iceland  Geothermal energy is one of the most dependable baseload renewables, but the gap between expected steam output and real production remains a central industry problem. Exploration models are always incomplete, and once wells are onstream, pressure decline, scaling, corrosion, and thermal breakthrough steadily erode performance. Why Forecasts Miss the Mark Exploration depends on sparse wells, surface manifestations, geophysical surveys, and geochemical indicators, so it only samples a small part of a complex reservoir. Reservoirs are rarely uniform, and permeability, porosity, mineralogy, and thermal conductivity can vary sharply over short distances, which means early temperature or chemistry readings can overstate how much of the reservoir will actually support long-term production. Phase behavior adds another layer of uncertainty. In two-...

Kaishan and Halliburton Boost Geothermal EGS, Green Hydrogen, and Green Ammonia Projects

Kaishan , Halliburton Team Up on Advanced Geothermal, Green Fuel Projects Kaishan Group and Halliburton have deepened their cooperation with a strategic memorandum of understanding centered on advanced geothermal development, especially enhanced geothermal systems (EGS), along with green hydrogen and green ammonia opportunities. The deal builds on earlier Indonesia drilling work and signals a broader push to combine Halliburton’s high-end well-construction capabilities with Kaishan’s geothermal equipment and project-development platform. Partnership Background The relationship did not begin with the July 2026 memorandum. In February 2026, Halliburton said it had won a multiyear contract from KS Orka Renewables , part of Kaishan’s wider corporate group, to support geothermal well construction at the PT Sorik Marapi Geothermal Power and PT Sokoria Geothermal Indonesia projects in Indonesia. That work covered directional drilling, cementing, drilling fluids, and drill bits across several...

Geothermal EPC Companies: How Developers Choose the Right Contractor for Projects

Geothermal EPC Companies: How Developers Choose a Contractor Image: A Thematic image of a geothermal power plant  Geothermal developers choose EPC contractors by combining technical geothermal experience, financial strength, execution credibility, and the ability to manage field-specific risk. In recent awards, the strongest bidders have been those with proven geothermal references, repeat-delivery history, and the ability to package engineering, procurement, construction, and commissioning into one bankable offer . Why geothermal EPC is different Geothermal EPC is more complex than standard power plant construction because the contractor must build around a live underground resource. That means the project team has to deal with reservoir uncertainty, steam chemistry, scaling, corrosion, reinjection behavior, plant-field interfaces, and grid interconnection all at once . For developers, this turns EPC selection into a risk-management decision. The contractor is not just a builder; ...

85 Degrees Renewable Secures €200M Project Finance Framework to Expand Dutch Geothermal Heat Infrastructure

85 Degrees Renewable Secures €200M Project Finance Framework to Accelerate Dutch Geothermal Heat Infrastructure 85 Degrees Renewable has taken a major step in the financing of geothermal energy with a new project finance framework of up to €200 million backed by ING and Rabobank. The facility is designed to support the company’s next phase of development in the Netherlands, including the expansion of its Central Oostland geothermal heat network and the broader growth of its renewable heat infrastructure platform. The announcement is especially significant because it shows that geothermal heat is increasingly being treated as a mature infrastructure asset rather than an early-stage experimental technology. The deal also highlights how geothermal energy is becoming more central to the Dutch energy transition. In a country where greenhouse horticulture is a major economic sector and heat demand remains heavily dependent on natural gas, renewable heat solutions are gaining strategic import...

Who Finances Next-Generation Geothermal Projects? Key Investors and Funding Trends

Who Is Financing the Next Generation of Geothermal Projects? Image : A thematic image of a geothermal power plant  The next generation of geothermal projects is being financed by a wide mix of venture capital firms, strategic corporate investors, commercial banks, institutional funds, and project finance lenders. The financing landscape is changing quickly because geothermal is moving from a niche clean-energy option into a serious infrastructure asset class with the potential to deliver reliable, 24/7 power at scale. Why geothermal finance is changing For years, geothermal struggled to attract large pools of capital because many projects were seen as technically risky, geographically limited, and difficult to scale. That perception is shifting as advanced geothermal technologies, especially enhanced geothermal systems, expand the number of places where geothermal can work. Investors now see a larger addressable market, stronger power demand, and better alignment with the needs of...

The Economics of 10 MW, 50 MW, and 100 MW Geothermal Plants

The Economics of 10 MW, 50 MW, and 100 MW Geothermal Plants Image: A thematic image of a geothermal power plant  Geothermal power has a simple promise and a complicated price tag. It turns heat from deep underground into steady electricity, but the money goes out long before the power comes in, because exploration, drilling, plant construction, and grid connection all happen up front. That is why plant size matters so much. In general, 10 MW projects tend to be the most expensive per kilowatt, 50 MW projects usually strike a better balance, and 100 MW plants can be the most efficient on a cost per electricity basis if the reservoir is strong enough. Why geothermal costs so much upfront The economics of geothermal are driven by risk and scale. A developer has to locate the resource, confirm temperature and flow, drill wells, build surface facilities, and connect everything to the grid before a single dollar of revenue is earned. That makes geothermal very different from technologies...