Exergy Signs 33 MWe Geothermal Contract with Maren in Türkiye Exergy International has signed a new contract with Maren Maraş Elektrik Üretim A.Ş. to supply the 33 MWe Mehmet Ege geothermal power plant in Germencik, in Türkiye’s Aydın province. The project will use Exergy’s Organic Rankine Cycle technology and include the company’s largest Radial Outflow Turbine supplied to date. Expected to enter operation in the second half of 2027, the plant will provide renewable baseload electricity from a geothermal resource with an estimated temperature of approximately 160°C. The agreement represents another major step in Exergy’s long-standing relationship with Maren and reinforces Türkiye’s position as one of the world’s most active geothermal markets. A Major Geothermal Investment in Aydın The Mehmet Ege geothermal power plant will be located in Germencik, a district within Aydın that has become a major centre for geothermal development. Türkiye’s western Aegean region conta...
El Salvador's Volcanic Awakening: How the Berlin 2 Plant is Powering a Nation's Bold Leap into the Future By: Robert Buluma Imagine a land where ancient volcanoes rumble beneath the surface, not as harbingers of destruction, but as silent guardians of boundless energy. In El Salvador, the smallest nation in Central America, this isn't just poetic fancy,it's reality. On December 13, 2025, amid the lush hills of Usulután, the inauguration of the Berlin 2 Binary Cycle Plant marked a seismic shift in the country's energy landscape. With a thunderous applause from engineers, officials, and locals alike, President Nayib Bukele's vision for a modern, self-sufficient El Salvador ignited into life. This isn't just another power plant; it's a beacon of innovation, harnessing the Earth's fiery core to light up millions of homes. Buckle up as we dive into this captivating story of renewal, resilience, and raw power. El Salvador has long been a geothermal powerho...