KenGen Risks Losing Olkaria Wells Over 18-Year Licence Blunder Kenya Electricity Generating Company (KenGen) faces a serious legal and operational risk at Olkaria after an error in the coordinates of its geothermal licence left part of the company’s wells, steam infrastructure and other assets outside its legally recognised area. The licensing mistake, made nearly two decades ago, remains unresolved despite the Ministry of Energy and Petroleum acknowledging the problem in 2017. The dispute has raised questions about the security of KenGen’s investments, the government’s management of geothermal resources and the potential consequences for Kenya’s electricity supply. Olkaria is the country’s most important geothermal centre and accounts for the overwhelming majority of Kenya’s installed geothermal generation capacity. Licence Error Exposes Strategic Assets The problem dates back to September 19, 2008, when the Ministry of Energy and Petroleum issued KenGen a licence covering ...
Alberta’s Phase Targets a Critical Geothermal Drilling Barrier With High-Temperature Sensors Alberta is using its deep oil-and-gas expertise to pursue a new opportunity beneath the surface: geothermal energy. Among the companies receiving support through Emissions Reduction Alberta’s Drilling Technology Challenge is Edmonton-based Phase Advanced Sensor Systems Corp., which is developing a high-temperature downhole pressure sensor for enhanced geothermal systems. The project addresses a problem that could determine whether deep geothermal energy becomes commercially viable: operators need reliable, accurate information from wells exposed to extreme heat and pressure. Phase plans to demonstrate a sensor capable of operating at temperatures above 200°C, with testing planned at 200°C, 250°C and 275°C. The project has a total value of approximately C$1.57 million, including C$420,000 in ERA funding, according to Alberta’s project information. Dealroom reported the award as approx...