Exergy Signs 33 MWe Geothermal Contract with Maren in Türkiye Exergy International has signed a new contract with Maren Maraş Elektrik Üretim A.Ş. to supply the 33 MWe Mehmet Ege geothermal power plant in Germencik, in Türkiye’s Aydın province. The project will use Exergy’s Organic Rankine Cycle technology and include the company’s largest Radial Outflow Turbine supplied to date. Expected to enter operation in the second half of 2027, the plant will provide renewable baseload electricity from a geothermal resource with an estimated temperature of approximately 160°C. The agreement represents another major step in Exergy’s long-standing relationship with Maren and reinforces Türkiye’s position as one of the world’s most active geothermal markets. A Major Geothermal Investment in Aydın The Mehmet Ege geothermal power plant will be located in Germencik, a district within Aydın that has become a major centre for geothermal development. Türkiye’s western Aegean region conta...
By: Robert Buluma Rodatherm Energy has done something no other geothermal startup has attempted at commercial scale: swapped water for refrigerant in a closed-loop system. The claim is 50% higher thermal efficiency than water-based binary cycles, achieved by circulating a proprietary phase-change fluid through a fully cased, pressurized wellbore. The company emerged from stealth in September 2025 with a $38 million Series A—the largest first venture raise in geothermal history. Lead investor Evok Innovations was joined by Toyota Ventures, TDK Ventures, and the Grantham Foundation. The engineering thesis is elegant. The execution risks are significant. This is an Alphaxioms examination of both. II. The Thermodynamic Distinction Every geothermal company you've covered moves heat using water or steam. Rodatherm moves heat using a fluid that boils and condenses inside the wellbore. In a conventional closed-loop water system (Eavor's model), water circulates as a single-phase liq...