Menengai’s Broken Promise: How Kenya’s Geothermal Model Lost the Steam Thematic image of the Olkaria Geothermal Field Kenya’s Menengai geothermal project was sold as a model of modern public-private partnership. The state would carry the difficult and expensive burden of geothermal exploration and drilling. Private power producers would then build, own and operate power plants. Geothermal Development Company would supply the steam; the independent power producers would convert it into electricity; Kenya Power would buy the output. On paper, the arrangement was elegant. In practice, Menengai has exposed a far more uncomfortable reality: Kenya’s public steam-supply model is not delivering the certainty it promised. Menengai Phase I was designed to produce 105 megawatts from three 35 MW plants. GDC’s own project page says the three plants were awarded to Globeleq Menengai Geothermal, Sosian Menengai Geothermal Power and OrPower Twenty Two under a build-own-operate structure. Yet the ...
Nysa May Be Sitting on Vast Geothermal Wealth: Exploratory Drilling to Begin in Spring 2026 By: Robert Buluma Nysa, a historic town in southern Poland, could soon become a regional pioneer in geothermal energy. With the signing of a contract for a geothermal exploratory well, the municipality has officially launched one of the most ambitious renewable energy projects ever undertaken in the Opole Voivodeship. Preparatory works will continue through 2025, with drilling scheduled to begin in spring 2026 and continue for approximately six months. The goal is clear: to confirm whether deep beneath Nysa lie geothermal waters capable of transforming the town’s heating system, economy, and environmental footprint. A Strategic Step Toward Energy Independence According to Nysa Mayor Kordian Kolbiarz, geothermal energy represents far more than a technological experiment. It is a strategic investment in the town’s future. If the geothermal resources are confirmed, they could supply heat and hot wa...