Exergy Signs 33 MWe Geothermal Contract with Maren in Türkiye Exergy International has signed a new contract with Maren Maraş Elektrik Üretim A.Ş. to supply the 33 MWe Mehmet Ege geothermal power plant in Germencik, in Türkiye’s Aydın province. The project will use Exergy’s Organic Rankine Cycle technology and include the company’s largest Radial Outflow Turbine supplied to date. Expected to enter operation in the second half of 2027, the plant will provide renewable baseload electricity from a geothermal resource with an estimated temperature of approximately 160°C. The agreement represents another major step in Exergy’s long-standing relationship with Maren and reinforces Türkiye’s position as one of the world’s most active geothermal markets. A Major Geothermal Investment in Aydın The Mehmet Ege geothermal power plant will be located in Germencik, a district within Aydın that has become a major centre for geothermal development. Türkiye’s western Aegean region conta...
GEN Electric Grid Impact Study RFP Signals a Defining Moment for Geothermal Energy Networks in the United States By: Robert Buluma The United States geothermal sector is entering a new phase, one where geothermal systems are no longer being viewed only as sources of heating and cooling, but increasingly as strategic infrastructure capable of strengthening the electric grid itself. In one of the most important emerging developments in utility-scale thermal network deployment, the Home Energy Efficiency Team (HEET), in partnership with Eversource Gas, has officially launched a Request for Proposals (RFP) for a groundbreaking Electric Grid Impact Study focused on Geothermal Energy Networks (GENs), also referred to as Thermal Energy Networks (TENs). Backed by funding from the U.S. Department of Energy under grant “DE-EE0010662.0002 Home Energy Efficiency Team Utility-Managed Geothermal Pilot in Framingham, Massachusetts,” the initiative represents far more than a local energy pilot. It is...