Sage Geosystems Selects Ormat’s Blue Mountain Plant for Project Vector: a Major Step Toward Commercial EGS Sage Geosystems will deploy its proprietary EGS technology at Ormat’s Blue Mountain power plant in Nevada for Project Vector, targeting first electricity in 2027 and full-scale production in 2028. The two-well project aims to deliver firm, 24/7 geothermal power with lower water losses and higher net output,advancing commercial EGS, validating GeoTwin predictive modeling, and strengthening strategic ties with Ormat amid growing corporate demand for reliable baseload clean energy. Why this matters Sage Geosystems’ selection of Ormat Technologies’ Blue Mountain geothermal plant for Project Vector represents a pivotal demonstration of commercial-scale enhanced geothermal systems (EGS) integrated into existing power infrastructure. The decision leverages an established plant to reduce non-core capital, accelerate timeline risk reduction, and prioritize validation of subsurface engineer...
Repurposing Hydrocarbon Wells for Geothermal Applications Insights from Our Interview with Christi on EGS, Storage, and Europe’s Energy Transition Christi is a Geothermal Resource Engineer and PhD Researcher, specializing in deep geothermal systems, closed-loop systems, well repurposing (especially converting old oil/gas wells for geothermal use), Enhanced Geothermal Systems (EGS), and Deep Borehole Heat Exchangers (DBHE). What if the thousands of oil and gas wells scattered across Europe could become the backbone of the geothermal transition? In our recent interview with Christi, a leading researcher involved in the TRANSGEO project, we explored the technical, economic, and regulatory realities of repurposing hydrocarbon wells for geothermal applications , particularly for Enhanced Geothermal Systems (EGS), thermal storage, and district heating integration. From case studies like Groß Schönebeck to regional analysis in Lausitz, Christi offered a grounded and technical perspective o...