Menengai’s Broken Promise: How Kenya’s Geothermal Model Lost the Steam Thematic image of the Olkaria Geothermal Field Kenya’s Menengai geothermal project was sold as a model of modern public-private partnership. The state would carry the difficult and expensive burden of geothermal exploration and drilling. Private power producers would then build, own and operate power plants. Geothermal Development Company would supply the steam; the independent power producers would convert it into electricity; Kenya Power would buy the output. On paper, the arrangement was elegant. In practice, Menengai has exposed a far more uncomfortable reality: Kenya’s public steam-supply model is not delivering the certainty it promised. Menengai Phase I was designed to produce 105 megawatts from three 35 MW plants. GDC’s own project page says the three plants were awarded to Globeleq Menengai Geothermal, Sosian Menengai Geothermal Power and OrPower Twenty Two under a build-own-operate structure. Yet the ...
$170 Million to Unlock the Heat Beneath: How the Philippines Is De-Risking Geothermal Exploration By: Robert Buluma Geothermal energy has always been one of the Philippines’ greatest untapped strategic advantages an indigenous, low-carbon baseload resource sitting quietly beneath the archipelago’s volcanic spine. Yet for decades, the country’s geothermal expansion has moved cautiously, constrained not by lack of resource potential, but by risk, particularly at the exploration and drilling stage. That may now be changing. In a landmark move, the Department of Energy (DOE) and the Land Bank of the Philippines (LandBank) have unveiled a $170 million Philippine Geothermal Resource De-Risking Facility (PGRDF),a financial mechanism designed to absorb the most uncertain and capital-intensive phase of geothermal development: early-stage drilling. Backed by a sovereign loan from the Asian Development Bank (ADB) , the facility signals a bold shift in how governments can catalyze geothermal gro...