Project Vector: Why Blacktail’s Surface Equipment Matters to the Future of Geothermal Power At a geothermal project, the most consequential engineering often happens out of sight. Wells reach into hot rock, stimulation creates pathways for fluid, and subsurface models attempt to predict how an engineered reservoir will perform. Yet every unit of useful heat must ultimately pass through equipment at the surface. That equipment connects the underground resource to the power plant—and turns an ambitious reservoir design into an operation that can be controlled, maintained and repeated. Blacktail Energy Holdings’ selection to supply the wellhead, production tree and frac stack for Sage Geosystems’ Project Vector brings that connection into focus. Announced on November 24, 2026, the agreement places Blacktail’s equipment at a critical interface in an enhanced geothermal system being developed at Ormat Technologies’ Blue Mountain power plant in Nevada. Blacktail will also support the project...
Baseload Power Taiwan and CPC Corporation Forge Strategic Partnership to Accelerate Geothermal Development By: Robert Buluma In a significant move for Taiwan's renewable energy landscape, Baseload Power Taiwan and CPC Corporation have signed a Memorandum of Understanding (MoU) to jointly accelerate geothermal energy development across the island nation. This strategic partnership represents a pivotal moment in Taiwan's energy transition journey, combining the strengths of a global geothermal specialist with the deep local expertise and resources of Taiwan's state-owned energy company. The Partnership at a Glance The agreement, announced just one day ago, establishes a framework for comprehensive cooperation between the two entities. Under this MoU, Baseload Power Taiwan and CPC Corporation will collaborate on multiple fronts, including resource evaluation, technical collaboration, due diligence, feasibility studies, and commercial discussions related to geothermal dev...