Project Vector: Why Blacktail’s Surface Equipment Matters to the Future of Geothermal Power At a geothermal project, the most consequential engineering often happens out of sight. Wells reach into hot rock, stimulation creates pathways for fluid, and subsurface models attempt to predict how an engineered reservoir will perform. Yet every unit of useful heat must ultimately pass through equipment at the surface. That equipment connects the underground resource to the power plant—and turns an ambitious reservoir design into an operation that can be controlled, maintained and repeated. Blacktail Energy Holdings’ selection to supply the wellhead, production tree and frac stack for Sage Geosystems’ Project Vector brings that connection into focus. Announced on November 24, 2026, the agreement places Blacktail’s equipment at a critical interface in an enhanced geothermal system being developed at Ormat Technologies’ Blue Mountain power plant in Nevada. Blacktail will also support the project...
How Baker Hughes and Mantle Reach Power are trying to make geothermal financeable, scalable, and grid-ready across North America By: Robert Buluma On 24 June 2026 Baker Hughes and Mantle Reach Power (backed by EnCap Energy Transition Fund III) announced a strategic commercial agreement to accelerate large-scale geothermal deployment across North America, targeting up to 500 megawatts (MW) of installed capacity over the next five years. The partnership frames Baker Hughes as an integrated subsurface solution provider, with Mantle Reach Power leading project development, ownership and financing. For energy professionals and investors, the announcement is important because it attempts to address the perennial stumbling blocks for geothermal — high upfront subsurface risk, limited developer and investor scale, and fragile project bankability — by combining deep-pocketed development capital, established drilling and subsurface technology, and a repeatable commercial structur...