Menengai’s Broken Promise: How Kenya’s Geothermal Model Lost the Steam Thematic image of the Olkaria Geothermal Field Kenya’s Menengai geothermal project was sold as a model of modern public-private partnership. The state would carry the difficult and expensive burden of geothermal exploration and drilling. Private power producers would then build, own and operate power plants. Geothermal Development Company would supply the steam; the independent power producers would convert it into electricity; Kenya Power would buy the output. On paper, the arrangement was elegant. In practice, Menengai has exposed a far more uncomfortable reality: Kenya’s public steam-supply model is not delivering the certainty it promised. Menengai Phase I was designed to produce 105 megawatts from three 35 MW plants. GDC’s own project page says the three plants were awarded to Globeleq Menengai Geothermal, Sosian Menengai Geothermal Power and OrPower Twenty Two under a build-own-operate structure. Yet the ...
Riehen Advances Geothermal Future: Loan Application for Major District Heating Expansion By: In the picturesque border municipality of Riehen, near Basel, Switzerland, a significant step forward in sustainable energy is underway. On March 5, 2026, the Government of the Canton of Basel-Stadt and the Municipality of Riehen jointly submitted a request to their respective parliaments: approve a conditionally repayable loan totaling CHF 15.2 million (approximately USD 19.4 million at current rates) to support the expansion of the local geothermal district heating network. Each entity—canton and municipality—proposes to provide CHF 7.6 million to the Wärmeverbund Riehen AG (WVR) , the operator of the system. This funding targets the ambitious “geo2riehen” project, which aims to scale up one of Switzerland’s oldest and most successful deep geothermal heating operations. Riehen has been a geothermal pioneer since 1994, when its first plant began delivering renewable heat extracted from de...