Skip to main content

Geodipa , Geophysical Tender survey for Candradimuka Geothermal Field

 Provision of MT, TDEM, and Gravity Data Acquisition Services in the Candradimuka Geothermal Field



Tender Number: 001.PLL/PST.PBJ-GDE/I/2024

Duration: 180 calendar days from the issuance of SPMK

Location: Banjarnegara Regency, Central Java

Procurement Method: Tender with Post-qualification

REGISTRATION AND COLLECTION OF WORK PLAN AND TERMS


Days: Monday, Tuesday, & Wednesday

Dates: January 29-31, 2024

Method: Email to procurement@geodipa.co.id

Time: 10:00 AM – 3:00 PM WIB

REGISTRATION REQUIREMENTS AND RKS DOCUMENT COLLECTION


Interested participants must email procurement@geodipa.co.id to receive instructions for transferring the RKS document replacement fee of Rp500,000.

Submit a scanned ID card, Rp10,000 stamped power of attorney from the company's leader (if delegated), and proof of payment to procurement@geodipa.co.id.

RKS EXPLANATION


Day: Thursday

Date: February 1, 2024

Venue: Online Meeting

Time: 10:00 AM – Completion

QUALIFICATIONS FOR PROCUREMENT PARTICIPANTS


Business entities: Limited Company, Cooperative, Consortium/Joint Venture (KSO/JV).


Qualification: Medium/Large

Field: Survey Services

Subfield: Geological, Geophysical, and Other Prospecting Services

Must have a valid E-Procurement SKT from PT Geo Dipa Energi.


In the last 10 years, participants must have performed at least 3 geophysical survey services (MT TDEM & Gravity) with a minimum value of Rp2,500,000,000 per project (excluding VAT).


Companies must not be bankrupt, suspended, facing criminal sanctions, or under judicial supervision.


Willing to comply with procurement regulations outlined in PT Geo Dipa Energi's Procurement Guidelines (PST.68-HDPRO-MAN-001) and other specified terms in the Work Plan and Requirements (RKS).


FOR FURTHER QUESTIONS AND INFORMATION


Participants can correspond via email to procurement@geodipa.co.id or WhatsApp at +62 85776521191.


ANTI-CORRUPTION MEASURES


Participants are urged not to offer, give, or receive gratuities, bribes, or any other forms of corruption within PT Geo Dipa Energi, as per the company's guidelines and ISO 37001:2016 on Anti-Bribery Management Systems.


Report violations/disclosures through:


Phone: 0811-1140-070

Comments

Popular posts from this blog

Pertamina Geothermal Energy,GDC and AGIL to develop 200 MW Suswa ,Narok Geothermal Field

Pertamina Geothermal Energy, GDC, and AGIL Agree to Accelerate Development of 2 Geothermal Fields in Kenya By: Robert Buluma Nairobi, Kenya, March 8, 2024 – PT Pertamina Geothermal Energy Tbk (PGE) has reached an agreement with Kenya's geothermal development companies, Geothermal Development Company Ltd. (GDC), and Africa Geothermal International Ltd. (AGIL), to expedite the development of geothermal fields in the African nation. Exploration of two geothermal fields in Kenya, developed by PGE along with its partners, is expected to commence in 2024. In high-level discussions held at GDC's headquarters in Nairobi on Wednesday (3/6/2024), PGE and GDC discussed the support from the Kenyan government in accelerating the geothermal field development project in Suswa, a volcanic area located in Narok, Kenya. GDC is a government-owned geothermal developer in Kenya. The PGE delegation, led by President Director Julfi Hadi and accompanied by PGE's Director of Exploration and Develop

Polands Geothermal Wells hits 5km depth Eyeing a 7Km Threshold

Geothermal Milestone Reached: Banska PGP-4 Well in Szaflary, Poland Hits 5-Kilometer Depth By : Robert Buluma In a significant development for geothermal energy enthusiasts, drilling operations at the Banska PGP-4 well in Szaflary, Poland have reached a depth of 5 kilometers, marking a major milestone in the project's progress towards its 7-kilometer target. Since its inception, the ambitious geothermal drilling project in Szaflary has been making steady strides. As of the end of 2023, the well has successfully reached a depth of 5000 meters, uncovering promising results along the way. Notably, the well has tapped into a sizable reservoir boasting temperatures of 120 °C. The drilling will persist until it reaches the targeted depth of 7000 meters, where another aquifer is anticipated. The entire drilling endeavor is slated for completion within the first quarter of 2024. Initiated in 2019, the plans to drill a 7-kilometer geothermal well in Podhale, Szaflary aimed at gathering cruc

Eavor Goes Deeper in Geretesried In Search For Geothermal

Revolutionizing Energy Production: The Birth of Eavor Technology in Geretesried By: Robert Buluma In the picturesque town of Geretesried, nestled in the heart of Germany, a groundbreaking project is underway that promises to reshape the future of energy production as we know it. Welcome to the world of Eavor Technology – where innovation meets sustainability in a bid to tackle the pressing challenges of climate change and energy security. Imagine a technology that harnesses the Earth's natural heat to generate both electricity and warmth without emitting harmful greenhouse gases. Sounds like science fiction? Well, it's not. Thanks to the relentless efforts of visionaries and engineers, the world's first Eavor loop for heat and electricity is currently under construction right here in Geretesried. At the forefront of this remarkable endeavor is the ambitious drilling project that has reached an astonishing depth of 7000 meters beneath the Earth's surface. Achieving such