Skip to main content

Posts

Showing posts with the label GreenTransition

Just In

Unlocking Impermeable Geothermal Reservoirs: Hydraulic Stimulation, Menengai and Olkaria

Unlocking the Impermeable Reservoir: Lessons from a 30-Year Reservoir Engineer An Alphaxioms interview with Richard Joseph Holt, Principal Consultant in Reservoir Engineering at RESPEC . Context: Menengai East and Olkaria Central. Every geothermal developer knows the moment.  The rig is gone and the money is spent. The well is drilled to depth, the temperature is there, and then the well will not flow. The heat is real, but the connection between the well and the reservoir is not. Wells like this sit at the centre of one of the most important questions in geothermal development: what do you do with a tight reservoir? Walk away and drill again, or find a way to unlock what is already there? To explore the question, Alphaxioms spoke with Richard Joseph Holt, Principal Consultant in Reservoir Engineering at RESPEC . Richard brings 30 years of global experience in geothermal energy.  We framed our questions around two settings, Menengai East and Olkaria Central, and asked him how ...

Hungary Unlocks 29 Billion Forint for Geothermal Drilling: Jedlik Ányos Program Fuels Major Expansion in Europe's Geothermal Hotspot

Hungary's Geothermal Boom: Jedlik Ányos Energy Program Unlocks 29 Billion Forint for Deep Earth Exploration and Green Heat By: Robert Buluma Posted by: Alphaxioms Geothermal News    Date: March 6, 2026 Hungary is stepping up its game in the geothermal arena with a major push under the Jedlik Ányos Energetikai Program (Jedlik Ányos Energy Program). As of early March 2026, fresh funding calls have opened, making a combined 29 billion footprint (approximately USD 80-85 million) available specifically for geothermal projects. This includes non-repayable grants to de-risk exploratory drilling and interest-free loans for larger-scale developments. For a country already in Europe's top tier for geothermal utilization thanks to the favorable geology of the Carpathian Basin, this is a game-changing injection that could accelerate the shift toward energy independence, lower heating costs, and reduced fossil fuel imports. Hungary's Exceptional Geothermal Advantages Hungary sits on som...

Kaishan KK01 Geothermal Milestone: All Tests Passed – Commercial Operations Imminent in Kenya's Menengai Field

Milestone Alert: Kaishan Group's KK01 Geothermal Power Plant in Kenya Completes All Tests – Set for Commercial Operations (COD)! Posted by: Alphaxioms Geothermal News   Date:March 6, 2026 Kenya's geothermal sector has achieved yet another significant milestone in the push for clean, reliable, and sustainable energy. On March 5, 2026, Kaishan Group Co., Ltd.(开山集团), a leading Chinese innovator in geothermal technology, proudly announced the successful completion of all independent third-party witnessed tests for their fully owned and operated KK01 (Kaishan Kenya 01) geothermal power station. Located in the prolific Menengai geothermal field in Nakuru County, this 35 MW net capacity plant has now cleared every hurdle, including a rigorous 30-day stability run that began on February 2. With all performance parameters meeting or surpassing design expectations, the independent engineer is poised to issue the final certificate and notify Kenya Power and Lighting Company (KPLC), marki...

Vinkovci’s Geothermal Breakthrough: Unlocking Croatia’s Clean Energy Future

Vinkovci Uncovers Massive Geothermal Potential: Studies and Documentation Underway By:  Robert Buluma Vinkovci, Croatia – November 3, 2025 Recent research at the Vinkovci GT-1 well has confirmed significant geothermal potential in the area, positioning Vinkovci as the third Croatian city—after Velika Gorica and Osijek—to record reservoir temperatures above 100°C. These findings continue a successful series of exploratory activities led by the  Croatian  Hydrocarbons Agency (Agencija za ugljikovodike) as part of the project “Preparation and Exploration of Geothermal Potential in the Context of Centralized Heating.” Energy of the Future Beneath Vinkovci Mayor Josip Romić expressed his excitement on social media, stating: "Research has confirmed what we believed from the start—Vinkovci and our region hold enormous geothermal potential. Beneath our feet lies the energy of the future, enabling us to reduce dependency on external factors and fluctuating energy prices. This is ...

Aarhus Turns Up the Heat: Europe’s Largest Geothermal District System Begins to Flow”

🌍 From Vision to Reality: Aarhus Powers Its Future with Geothermal Heat By:  Robert Buluma Aarhus, Denmark has officially turned a bold vision into a living reality. The city has become the latest symbol of Europe’s clean energy transition — as geothermal heat now flows directly into Aarhus’ district heating grid for the very first time. This milestone didn’t happen overnight. It’s the result of three years of visionary planning, engineering excellence, and environmental determination by Innargi , in close partnership with Kredsløb and the City of Aarhus. Together, they’ve taken the silent power beneath our feet and transformed it into a renewable energy solution that is set to redefine how cities heat their homes and power their future. 🔬 The Science Behind the Heat At the heart of this transformation lies the Skejby geothermal plant, a marvel of modern engineering. From sandstone reservoirs located 2.5 kilometers beneath the earth’s surface, naturally warm water — reaching temp...

Košice Ignites Its Geothermal Future: A 30-Year Dream Becomes Reality”

Košice Turns Up the Heat: Geothermal Energy to Warm the City After 30 Years in Waiting By: Robert Buluma After three decades of anticipation, the city of Košice, Slovakia, is finally set to tap into one of the Earth’s cleanest and most sustainable energy sources geothermal heat. On Wednesday, drilling begins on the long-awaited project “Utilization of Geothermal Energy in the Košice Basin”, marking a major leap toward energy independence and carbon neutrality for Slovakia’s eastern metropolis. From the site of Svinica–Ďurkov, a new deep geothermal well will be drilled, expected to reach a temperature of 135°C and a flow rate of 55 liters per second. Two reinjection wells each plunging roughly 3,700 meters deep  will accompany the main production well, ensuring a closed-loop system that reuses and reheats the geothermal water beneath the Earth’s surface. The third and final well is expected to be completed by mid-2026. Turning Vision into Reality The geothermal heating project is be...

Innargi Deep: Seismic Surveys Spark Geothermal Heating RevolutionHeading: Łódź DiINNARGI Digs Deep: Seismic Surveys Spark Geothermal Heating Revolutiong Revolution

🌍 Seismic Surveys Kick Off Geothermal Exploration in Łódź Why Łódź is Going Underground for Clean Heat By:  Robert Buluma In an exciting development for climate-focused energy innovation, the Danish company Innargi has teamed up with Veolia Energia Łódź to explore the geothermal potential beneath the city of Łódź, Poland. A letter of intent signed in late 2024 formalized their long-term partnership to decarbonize the city's district heating system by tapping into renewable geothermal resources. Mapping the Earth: What’s Happening & When Starting around August 11, 2025 , seismic surveys are scheduled to begin across four routes covering approximately 160–186 km throughout the city. Specialized vibro‑trucks will send controlled vibrations—lasting roughly 20 seconds—into the ground. These signals are captured by geophones placed in advance along the planned routes. The data will be used to build a detailed subsurface map in just 4 weeks . Survey operations are prima...

Popular posts from this blog

GDC Opens Restricted Tender for Menengai Wellbore Scale Services

GDC Opens Restricted Tender for Menengai Wellbore Scale Services Kenya’s Geothermal Development Company Limited (GDC) has announced a new restricted tender targeting one of the most technically important challenges in geothermal field operations: scale formation and its removal from geothermal wells and formations . The procurement notice, posted by GDC on 29 September 2026 , seeks qualified firms to provide specialized downhole wellbore and formation-scale removal and scaling mitigation services for geothermal wells and reservoirs at the Menengai Geothermal Field . The planned service period is three years , creating an opportunity for specialized geothermal service companies with experience in downhole intervention, scale management, wellbore remediation and formation-scale mitigation. According to the notice, interested and qualified firms must submit their full company details and contacts together with their Electronic Government Procurement System (eGP) registration number t...

Maren Maras plans 99-MW geothermal power development in Aydin, Türkiye

Maren Maras plans 99-MW geothermal power development in Aydin, Türkiye Maren Maras is planning a 99-MW geothermal development in Aydın’s Germencik district, consisting of three 33-MW plants with binary-cycle technology, based on regulatory filings and the Final EIA report. The project is expected to generate about 730 GWh annually and requires an estimated TRY 1.82 billion investment. Maren Maras Plans 99-MW Geothermal Power Development in Aydın, Türkiye Maren Maras Elektrik Üretim Sanayi ve Ticaret A.Ş., part of Kipaş Holding, has advanced plans for a major geothermal expansion in Türkiye’s Aydın province. According to regulatory documents and reporting on the company’s environmental filings, the project will add 99 MW of installed geothermal capacity in the Germencik district through three separate 33-MW power plants.  The project adds another large-scale development to one of Türkiye’s most active geothermal regions. Aydın has long been a core province for geothermal power in th...

Global Geothermal Policy Outlook for 2027 Across Key Markets

Global Geothermal and Energy Policies for 2027: A Future Outlook Introduction The next phase of global geothermal development will be shaped not only by geology and technology, but increasingly by national energy policy . Governments are now treating geothermal as more than a niche source of heat or power . They are beginning to see it as a practical option for firm low-carbon electricity, district heating, industrial heat, and energy security. That shift matters because geothermal projects are unusually sensitive to policy design. Exploration is capital intensive, drilling is expensive, subsurface risk is real, and project timelines can stretch over years before revenue begins. In other words, geothermal is not just an engineering challenge. It is also a finance, regulation, and infrastructure challenge. Looking toward 2027, five countries offer a useful benchmark for where geothermal policy may be heading: the United States, the United Kingdom, Norway, Canada, and France. Each countr...

North Rhine-Westphalia Deep Geothermal Energy District Heating Expansion

North Rhine-Westphalia Pushes Geothermal Into Mainstream Heat Supply With New Deep Drilling Projects North Rhine-Westphalia (NRW) is accelerating its push to make geothermal energy a major component of the region’s future heat supply, with the state backing exploration, drilling, feasibility studies and financial mechanisms designed to reduce the risks associated with developing underground heat resources. The latest developments were presented at the 21st Geothermal Conference in Bochum, hosted by NRW.Energy4Climate and the Fraunhofer Research Institution for Energy Infrastructures and Geotechnologies IEG (Fraunhofer IEG). The conference highlighted a growing transition in NRW geothermal development: geothermal energy is moving beyond research and individual demonstration projects toward practical deployment in municipal heating, district heating networks, residential developments and industrial applications. The state has already financed measurements and drilling activities across s...

Geothermal Funding, August ,September 2027 With Intelligence into 2028

Geothermal Funding in August and September 2027: Investment Outlook and Intelligence Into 2028 Geothermal funding in August and September 2027 is likely to focus on projects that can demonstrate commercial resource potential, credible drilling plans, secure offtake, and a clear path to construction. The market will increasingly move beyond broad technology experimentation toward financeable geothermal assets supported by government grants, development-finance institutions, strategic investors, utilities, and corporate power buyers. The most significant investment themes will likely include enhanced geothermal systems , exploration drilling, closed-loop geothermal , data-center power supply, conventional geothermal expansion in East Africa, and blended finance for emerging markets. By 2028, investors are expected to distinguish more sharply between companies with proven technical performance and those still dependent on laboratory results or unconfirmed resource estimates. The 2027 Fun...

Sonoma Clean Power secures $20M in state funding to advance California geothermal initiative

Sonoma Clean Power Secures $20 Million in State Funding to Advance California Geothermal Initiative Sonoma Clean Power has secured $20 million in state support for its California geothermal initiative, a milestone that strengthens the case for next-generation geothermal development in the state. The funding is aimed at reducing early-stage exploration risk, with private-sector partners expected to match the public investment, bringing the total pool to $40 million.   A major step for GeoZone The announcement builds on Sonoma Clean Power’s GeoZone strategy, which targets 600 megawatts of next-generation geothermal energy across Sonoma and Mendocino counties over the next decade. The initiative is designed to secure affordable, reliable clean power for local customers while advancing California’s broader clean-energy goals.  The latest funding breakthrough gives the project more momentum at a critical stage. In geothermal development, exploratory drilling is often one of th...

Quaise Energy Secures DOE Funding for Superhot Geothermal Plant

Quaise Energy Wins DOE Support for Project Obsidian as Superhot Geothermal Moves Toward Commercial Scale Quaise Energy’s selection for up to $25 million in U.S. Department of Energy support is a meaningful milestone for superhot geothermal power, especially because it is tied to Project Obsidian, the company’s flagship commercial-scale Enhanced Geothermal System in Central Oregon. The award strengthens the case that superhot geothermal is shifting from laboratory promise toward field-tested infrastructure, with the first well triplet designed to validate a path to more than 25 megawatts of gross electric power and future expansion potential much larger than that.  DOE backs superhot geothermal The U.S. Department of Energy selected Quaise under its Next-Generation Geothermal Field Tests and Geothermal Resource Characterization and Confirmation funding opportunity, part of a broader $99 million geothermal push announced this week .According to DOE, the selected projects are mean...

Green Therma deploys closed-loop geothermal demonstration in Groß Schönebeck, Germany

Green Therma deploys demonstration of closed-loop geothermal in Groß Schönebeck, Germany Green Therma has deployed its closed-loop geothermal demonstration at the Groß Schönebeck research site in Germany, and the project is now moving from installation into operation. The system is intended to test the company’s Heat4Ever/DualVac concept under real geothermal conditions at depths of more than 3 kilometers.  Green Therma deploys closed-loop geothermal demonstration in Groß Schönebeck, Germany Green Therma has reached an important milestone in the development of closed-loop geothermal technology with the deployment of its demonstration project at the Groß Schönebeck research site in Germany. The company says the system is now circulating water through a single-well closed-loop configuration, bringing geothermal heat to the surface from more than 3 kilometers underground.  The project is being carried out at the GFZ Helmholtz Centre for Geosciences’ geothermal research facility,...

Belgrade Launches Phase 3 Geothermal Study Tender for District Heating

JKP Beogradske elektrane , has launched a new tender for the third phase of scientific studies into the geothermal potential of underground water resources at sites within its heating-plant and boiler-house network.  The procurement is for services, uses an open procedure, and carries reference number 160 ОУ/26. The submission deadline is 19 October 2026 at 10:30, and the tender status is listed as published.  This procurement is significant because it shows that the city’s geothermal program is moving beyond preliminary exploration and into a more detailed assessment phase. The tender documentation indicates that the work is intended to support the evaluation of geothermal resources for district heating use, which aligns with broader efforts to reduce reliance on fossil fuels in urban heating systems.  What the Tender Covers The procurement title is “Phase 3 scientific study of the geothermal potential of underground water resources in the territory of heating plants and...

Grenada Geothermal Project Advances With Slimhole Wells Procurement.

Grenada’s Geothermal Slimhole Procurement Signals Project Momentum Grenada has moved another step forward in its geothermal drilling program with a new invitation to bid for civil infrastructure and water supply equipment for two geothermal slimhole wells, a procurement package that points to concrete field preparation rather than just planning on paper . The notice breaks the work into three lots and covers access roads, drill pad civil works, water supply infrastructure, and power equipment needed to support drilling operations . Project Context The procurement is being issued by Grenada’s Ministry of Climate Resilience, the Environment and Renewable Energy through its Project Management Unit, while the Ministry of Infrastructure serves as the executing agency . The works are tied to the Government of Grenada’s geothermal drilling project and are being financed in part by the Caribbean Development Bank, according to the notice [1]. That funding link matters because it shows the proje...