⚡ Zenith Volts Breaks Ground on 1.24GW Off-Grid Data Center Campus in Roswell, NM By: Robert Buluma In a bold step toward sustainable, off-grid computing, Zenith Volts has secured planning approval for a massive 8,500-acre data center project in Roswell, New Mexico. The 1.24GW campus, set to be fully operational by November 2027, is designed to power AI, cloud, and high-performance workloads while integrating some of the most advanced energy and cooling solutions in the industry. Powering the Future: Diverse Energy Solutions The Roswell campus is planned as a fully diversified energy ecosystem. On-site solar arrays will provide primary power, while natural gas generators act as backup for reliability. Adding to this is a 250-acre battery energy storage system and modular solar-thermal hybrid setups—designed to balance peak load demands efficiently. But the real game-changer? Geothermal cooling. By tapping into the stable underground temperatures of New Mexico, Zenith aims to dras...
At Alphaxioms,We are The Number One Geothermal News Site Globaly, Our Cutting Edge Consultancy In Geothermal Energy Encomprises Geothermal Resource Assesment,Power Plant Development, Projects Management and Financing, Corprate Planning and Strategy, Reservoir Management, Lithium Extraction From Geothermal, Geological Hydrogen , Repurposing of Oil and Gas Wells and Related Research