Skip to main content

UK’s Deepest Closed-Loop Geothermal System Installed: Scunthorpe General Hospital Pioneers NHS Net Zero Heating with CeraPhi Energy’s 550m CeraPhiWell™

UK’s Deepest Geothermal Heating System Goes Live: Scunthorpe General Hospital Leads NHS Net-Zero Revolution with CeraPhi Energy’s 550m CeraPhiWell™ Project

December 2025 – In a landmark moment for British clean energy and healthcare decarbonisation, CeraPhi Energy has begun installing the UK’s deepest closed-loop geothermal heat systems at Scunthorpe General Hospital, part of the Northern Lincolnshire and Goole NHS Foundation Trust. The project, which started in October 2025 and is on track for completion by February 2026, repurposes an existing 550-metre borehole into a revolutionary CeraPhiWell™ system that will deliver continuous, low-carbon baseload heat to the entire hospital campus.

Why This Project Matters for UK Geothermal Energy

Geothermal energy has long been seen as the “missing piece” in the UK’s net-zero puzzle. While wind and solar dominate renewable headlines, they are intermittent. Hospitals, however, need 24/7 reliable heat – exactly what deep geothermal can provide without the massive land footprint of heat pumps or the emissions of gas boilers.

This Scunthorpe installation will be the deepest closed-loop geothermal system in the UK, proving that even modest-depth boreholes (550 m is shallow by global geothermal standards) can be retrofitted with advanced coaxial closed-loop technology to extract meaningful amounts of heat from the Earth. The project positions Scunthorpe General Hospital as a national trailblazer in sustainable healthcare infrastructure and provides a replicable blueprint for the hundreds of NHS sites still reliant on fossil-fuel heating.

How the CeraPhiWell™ Closed-Loop System Works

Unlike traditional open-loop geothermal schemes that pump water in and out of aquifers (often facing regulatory and water-quality hurdles), CeraPhi Energy’s patented CeraPhiWell™ is a completely sealed, “plug and play” coaxial system:

A working fluid circulates inside a sealed inner tube down to 550 m.
Heat is absorbed from the surrounding rock through conduction.
The warmed fluid returns via the annulus between the inner and outer tubes.
Heat is extracted at the surface via a heat exchanger and fed into the hospital’s district heating network.
No groundwater is extracted or contaminated making permitting faster and risk lower.

The result? A fossil-fuel-free baseload heat supply that operates silently, with almost no visual impact and a lifespan measured in decades.

Project Scope at Scunthorpe General Hospital

The contract awarded to CeraPhi Energy includes three major components:

1. Conversion of the existing 550 m borehole into a fully operational CeraPhiWell™ closed-loop geothermal well.
2. Design and installation of a high-efficiency energy centre incorporating heat pumps and thermal storage.
3. Development of a new low-temperature heat network linking multiple hospital buildings for optimal distribution.

Gary Williams, COO of CeraPhi Energy, commented:  
“Repurposing an existing asset like the 550 m borehole with our CeraPhiWell™ technology provides an accelerated, cost-effective, and low-risk pathway to delivering baseload geothermal heat. This contract is a testament to the versatility of our ‘plug and play’ system for commercial and public sector decarbonisation.”

Karl Farrow, Founder-CEO of Geothermal Development Company  CeraPhi Energy, added:  
“Having worked on the project in somewhat stealth mode over recent months, it’s great to see boots on the ground. Scunthorpe Hospital in Lincolnshire is becoming a leading adopter of deepgeothermal solutions for baseload heating.”

Bigger Picture: NHS Net Zero and the Race to 2040

The NHS is the largest public-sector emitter in the UK, responsible for around 4–5 % of national emissions. The Greener NHS programme has set an ambitious target: net-zero carbon for the emissions it can control by 2040, and for its wider footprint by 2045.

Heating accounts for roughly half of NHS energy use. Switching hospital estates from gas boilers to renewable alternatives is therefore critical. The Scunthorpe project demonstrates that deep closed-loop geothermal can be delivered quickly, even on existing sites with legacy boreholes  a huge advantage over greenfield projects.

What Happens Next?

With work already underway and completion slated for February 2026, Scunthorpe General Hospital will soon become the first NHS trust in England to be heated by a commercial-scale deep closed-loop geothermal system. The data and performance metrics from this flagship installation will be closely watched by other NHS trusts, local authorities, universities, and large industrial sites across Britain.

CeraPhi Energy has already completed multiple feasibility studies for NHS campuses and other large heat users, meaning a pipeline of similar projects is ready to follow once Scunthorpe proves the model at scale.

 Final Thoughts

The announcement from CeraPhi Energy is more than just another renewable energy press release. It is tangible proof that the UK can move fast on geothermal when the right technology meets the right policy environment. A 550-metre borehole that might have been abandoned is being transformed into the beating heart of one of Britain’s most innovative hospital heating systems.

As Karl Farrow said:  
“This is not just a milestone for CeraPhi Energy  it’s a major step for UK decarbonisation and a powerful example of what’s possible when innovation meets commitment to sustainability.”


The future of British geothermal just got a lot warmer – and Scunthorpe General Hospital is leading the way.


Connect with us: LinkedInX

Comments